ÖZKARDEŞLER · Approval and re-order

How to manage sample approval and revision archives in cutting dies?

In addition to the dimensions of the cut part, its folding, locking, and carrying the actual product are also checked. The material, thickness, surface treatment, and production method of the sample are recorded. A mock-up prepared with a different material can show geometry; it does not single-handedly approve the cutting and folding behavior of series production. Write down which features were tested in the approval and which ones are not yet verified.

Evaluate revision records in BOBST jobs together with the machine model and stations to be used. You can continue from the relationship between cutting, waste stripping, and blanking in the tooling scope and machine compatibility in BOBST cutting dies guide.

Keep the die code and revision in separate fields

Die ID defines the physical tooling; the revision code defines the current production data. Job name, machine model, sheet layout, material, and approval date must be matched with the same record. Clearly state which tooling the variant prepared for another machine or a different number of cavities is associated with. Sample file name: IS2041_BOX_R03_2026-10-17.dxf. This name is a suggestion; it does not replace your company's recording system.

Make the changed line visible

When the flap style, window, or creasing location changes, sending only the new file may not be sufficient. Mark the old and new dimensions, the affected positions, and the technical reason for the change. Create an authorized approval record for the file to be released for production. Keep the old version in a traceable archive while separating it to prevent accidental selection for production.

Re-orders are not automatic technical approvals

The old die number provides a starting point; it does not prove that the material and machine have not changed. For a repeat job, current product, die condition, counterplate, and auxiliary tooling compatibility are re-evaluated. Sharing the sample photo, date, and previous production issue, if any, with the same package reduces back-and-forth correspondence.

Checklist for quotation and evaluation

  • Job and die code, machine and material
  • Current drawing revision and change note
  • Dimensions and functions checked on the sample
  • Approver, date, and re-order expectation

Explore other cutting die technical guides