ÖZKARDEŞLER · TECHNICAL NOTES

Combine Sample Approval with File, Material, and Decision

Combine function and dimension control on the packaging sample with a revision log; clearly define the version intended for production.

Liking a sample and giving production-basis approval are different decisions. State in writing which file, material, and inspection scope the approval covers.

Define the purpose of approval

Explain what a visual mock-up, structural sample, and production sample represent. Check layout, closure, and handling with the actual product. Do not assume a model prepared with a different material fully represents series production behavior.

Describe the revision clearly

Record the dimension to be changed, the direction, and the rationale. Separate the new version from the previous file; designate the single version on which production is based. Make the scope visible by marking checklist items as passed, to be corrected, or not evaluated.

Re-evaluate upon modification

Modifications can be made after approval; however, the affected file, cutting die, and production steps must be reconsidered. Store the approved sample under appropriate conditions with its file ID. Re-validate the validity of the previous approval when the material or production conditions change.

Let us clarify your needs together

Share your current drawing, material, and sample information with Özkardeşler; let us evaluate the requirements of your application together.

Explore other cutting die technical guides