Cutting Die Delivery Time: Pre-Order Planning Guide
Plan your delivery schedule more reliably by clarifying file, approval, material, and shipping information when ordering a cutting die.
When determining the date you will need the cutting die in your production plan, evaluate the process from order to delivery together. The schedule is finalized through technical preparation, mutual approval, and shipping decisions.
Which approval starts the timeline?
Ask about the starting condition for lead time when you request a quote. Sharing the current drawing and giving production approval are different stages. Determine the person who will give approval and the response date in your plan.
Is the file ready for production?
Share dimensions, cutting and folding lines, the machine to be used, and the material in the same information package. Clarify any remaining questions in writing before placing the order.
How will changes be managed?
Subsequent dimension or material changes may require re-evaluation. Confirm the validity of the delivery date with each revision; do not confuse old files with production approval.
Is shipping included in the plan?
The completion of production and the arrival of the cutting die at your facility may not be the same date. Specify the delivery address, transport method, and the day the cutting die will be used separately.
Pre-order check
• Is the name and revision of the approved file clear?
• Have material and machine information been shared?
• Is it clear who will perform the final check?
• Are the delivery target and shipping method in writing?
Share your drawing, production information, and delivery target with Özkardeşler; let us clarify the scope of your order together.