ÖZKARDEŞLER · TECHNICAL NOTES

Read Die Pricing Through Scope Beyond Rule Length

Compare geometry, material, processing scope, and delivery conditions together in die pricing; separate the rule cost from the complete die.

Two jobs with similar external dimensions may have different cutting die scopes. Do not limit comparisons solely to square meters or rule lengths.

Explain geometry and operations

Indicate internal apertures, tight turns, and creasing or perforation requirements. Write down layout and cavity counts separately. Provide material to be cut and machine information; keep in mind that drawing complexity can affect preparation and inspection work.

Ask what is included

Steel rule cost, assembled cutting die, and additional stripping tooling are not the same scope. Clarify the status of sample, revision, packaging, and dispatch items. Do not confuse cutting die quantities with packaging runs.

Match the quote with current information

Share old job numbers and changing conditions. Separate delivery targets from dates verified to be met. Compare on the same scope, material, and acceptance expectations; do not assume a single price list will explain all jobs.

Let us clarify your needs together

Share your current drawing, material, and sample information with Özkardeşler; let us evaluate the requirements of your application together.

Explore other cutting die technical guides