ÖZKARDEŞLER · TECHNICAL NOTES
Monitor Blanking Results with Edge Quality and Stacking Arrangement
Review product transfer, waste stripping, and stacking arrangement together during the blanking process; track changes with records.
Proper separation and stacking of the cut product affect the order of subsequent operations. Do not limit the blanking evaluation to a single cut piece alone.
Examine contact during transition
Check the relationship of the product contour with the stripping tool and the passage of delicate tabs. Mark points where friction or edge damage is observed. Verify tool clearances for the machine, product, and material; do not apply a general allowance to all jobs.
Evaluate waste and retention together
Monitor waste remaining from the previous stage, sheet integrity, and stripping behavior. Record early separation during transport and fiber tearing at the moment of stripping separately. The technical retention arrangement must be determined by the expert team.
Record the stack with its conditions
Relate slippage, rotation, or edge irregularity to operating speed and material batch. Perform controlled trials according to the machine manufacturer's methods. Examine the upper and lower tools and the stacking system together; do not interpret a faulty stack solely as a cutting die malfunction.
Let us clarify your needs together
Share your current drawing, material, and sample information with Özkardeşler; let us evaluate the requirements of your application together.
