ÖZKARDEŞLER · TECHNICAL NOTES

Plan Waste Stripping and Stacking as Separate Tasks

Separate stripping and blanking needs; evaluate waste ejection, usable product, and downtime records together.

Stripping is related to the removal of waste, while blanking is related to the separation of products from the sheet. Subsequent stacking arrangement should also be evaluated within the overall flow.

Write down the desired flow clearly

Specify the machine hardware and the condition in which the product will be delivered. Do not use waste removal and independent product stacking as the same request. Do not assume that every line can perform these operations in the same sequence.

Read the geometry together with the output

Mark narrow internal wastes and sensitive product protrusions. Verify layout intervals, handling integrity, and tooling access with the technical team. Do not equate material saving solely with the tightest layout.

Track loss with separate items

Record material loss, manual correction time, and machine downtime separately. Compare stacking edges and product damage. Evaluate changes through controlled trials; measure actual results without guaranteeing zero intervention or a specific scrap reduction.

Let us clarify your needs together

Share your current drawing, material, and sample information with Özkardeşler; let us evaluate the requirements of your application together.

Explore other cutting die technical guides