ÖZKARDEŞLER · Design and sample
packaging prototype and mockup service: what should you approve in the sample?
Özkardeşler offers prototype and mockup services. One study may aim to test the product fitting into the box, while another may aim to test the print position or setup. A scaled presentation mockup and a production sample in real material are not the same proof. Before requesting a quote, specify which question you want to answer: dimensions, creasing, lock, partition, appearance, or shipping layout.
If you are going to proceed with paperboard cutting die or corrugated board cutting die preparation after the sample, match the approved dieline with the actual material and machine information. Record the geometry approval given in the prototype separately from the cutting and creasing check in mass production.
Discuss the usage scenario before the product dimensions
Inner dimensions, outer dimensions, product insertion direction, and the opening style of the packaging must be described in the same file. For fragile or multi-part products, support requirements are determined separately. There is no fixed clearance allowance added to every product. The actual product or a dimensioned representative sample makes the assumptions of the design visible.
Note the actual material difference
If the paperboard, corrugated board, or coating used in the prototype differs from mass production, this difference must be stated in the approval. The same grammage can exhibit different thickness and folding behavior. Since there may be differences in cutting and creasing methods between a sample prepared with digital cutting and die-cut mass production, which features will be tested separately should be clarified.
Give approval with a measurable checklist
Check product placement, lid/lock function, assembly sequence, and partition matching, if any, together. The revision code, date, and modified points should be matched with the sample. Instead of giving general approval with a single photo, write down which dimensions and functions have been approved. Subsequent die work relies on this approved geometry and completed production information.
Checklist for quotation and evaluation
- Product dimensions or actual product
- Approval purpose and usage scenario of the mockup
- Actual material and coating information
- Critical dimensions, functions, and revision record
